New construction Terraced villas in Sant'Agata sul Santerno

Sant'Agata sul Santernotoscanini
  • € 237,000 - € 255,000
  • 4
  • from140
  • 7
Description

This description has been translated automatically by Google Translate and may not be accurate

Code: HAM/01/12 - For sale - Sant'Agata sul Santerno Paese - Real estate complex consisting of 2 buildings, which for better understanding we will call Building C and Building D. The buildings are cross-cut and each composed of 4 independent villas . The customer will have maximum choice of internal finishes. The villas will be equipped with:• external aluminum frames, such as adjustable slat shutters, with the exception of the windows of the bathrooms and the storage rooms on the ground floor where darkening is not provided.• single-leaf armored entrance doors, painted pantographed external panel , smooth white internal panel, complete with lock and handle.• white PVC glass frames complete with satin chrome hardware with return/return in each opening.• interior doors in laminate and satin chrome hardware.• overhead garage doors ready for motorization, without pedestrian door. • independent water system, for each accommodation there is a connection for the washing machine, one for the dishwasher, one for the kitchen sink and an external water point. • provision for A/C. • heating and production of domestic hot water via pump heat, radiant floor panels and provision for electric heated towel rails in the bathrooms. • stairs and landings in Troni marble, 2 cm thick with skirting of the same material. • iron parapet with vertical rods, simple design and handrail. • floors of all internal rooms in single-fired or first choice porcelain stoneware • 2 kw/h photovoltaic system, ducting and telephone boxes in all rooms (excluding wires and sockets). • provision for alarm (n. 2 perimeter sensors, ducts only).--db31cb4824c8dcf7f008f05ce1712eea!
Information
other features
Disabled access
Features
Reference and listing Date
HAM/01/12 - 03/01/2024
contract
Sale
unit
8 residential
Construction start and expected delivery date
09/09/2023 - 04/30/2024
type
Project
Work progress

Il progetto è stato autorizzato dal comune ed i lavori sono iniziati come da programma. Attualmente il cantiere procede a un passo molto veloce di costruzione, sono stati costruiti i muri e si è arrivati al tetto. Il livello dei lavori permette ancora ai futuri clienti di fare delle modifiche interne.

Type and prices
Energy efficiency
Air conditioner
System predisposition
Energy Efficiency
A4≥ 3,51 kWh/m² year
Additional options

Contact the advertiser