New construction Apartments in Villa Guardia

Villa GuardiaVia Vittorio Veneto
  • € 280,000 - € 305,000
  • 3 - 4
  • from113
  • 4
Description

This description has been translated automatically by Google Translate and may not be accurate

New A4 class apartments at Villa Guardia

A new residential project is born in Villaguardia: 26 residential units in seven modern buildings with private gardens on the ground floor and large loggias on the first floor.
A real intervention based on the principles of energy saving and construction sustainability, to once again enhance an area in the center of Villa Guardia. A project made with the most performing and innovative materials on the market. The building will have garages and private parking spaces within the complex.

Different sizes according to your needs!

ALL INCLUSIVE offer including:

Garage and private parking space
NO Notary's fee for the stipulation of the preliminary sales contract
NO Land registry costs
NO Connection costs
Guarantee surety
After ten years

Sales method

Homepooling offers you a simple purchase path thanks to the strength of multiple buyers.
Choose and book the best solution suited to your needs with a simple purchase proposal without paying anything.
Once 80% of reservations have been reached, construction begins.
A 10% deposit will be required from the preliminary contract and the remaining 90% will be paid upon deed with release of the ten-year posthumously.

Sustainability
CLASS A4 homes with independent heating with heat pump and proprietary photovoltaic panels.
The new construction will respect the highest standards of energy and technological efficiency.

Location

Homepooling Villa Guardia yes located in via Vittorio Veneto, in a well-served residential area. In fact, the main services are nearby: bars, restaurants, schools, supermarket, clinic, town hall, shops, etc. In just 20 minutes you can reach the center of Como with its characteristic lakefront.--4225ac533f31c7ba1bffd80b033249d8!
Information
other features
Disabled access
Window frames in double glass / PVC
Features
Reference and listing Date
Nuova costruzione Villa Guardia - 03/21/2024
contract
Sale - Download brochure
unit
26 residential
Construction start and expected delivery date
07/01/2023 - 07/01/2024
type
Project
total building floors
1 floor
Car parking
26 in garage/box, 27 in shared parking
other features
Window frames in double glass / PVC
Work progress

Non appena viene raggiunto l’80% delle prenotazioni, inzia la costruzione. Homepooling ti offre un percorso di acquisto semplice grazie alla forza di più acquirenti.

Type and prices
Energy efficiency
heating
Independent, floor heating, powered by heat pump
Air conditioner
System predisposition
Energy performance of the building
wintery summery
Energy Efficiency
A4≥ 3,51 kWh/m² year
Additional options

Contact the advertiser