This description has been translated automatically by Google Translate and may not be accurate
New last mile warehouse in Verona (VR)
New logistics warehouse in Verona located in an enviable position, just 600 meters from the entrance to the Southern Ring Road, 1.3 km from the A4 Verona Sud toll booth and 8 km from Valerio Catullo Airport.
The property has a covered area of 7,080 m2, of which: warehouse of approximately 6,374 m2; approximately 256 m2 for office use, with the possibility of expanding via a mezzanine for a further 550 m2; bathrooms and changing rooms of 120 m2; Atex certified forklift loading room of 180 m2.
The cross-dock warehouse has a height under the beam of 11.70 meters and is equipped with 5 loading bays for trucks (equipped with buffers and platforms) and 19 bays for vans (+ 4 optional).
Outside there is a large concrete square with the following dimensions: 18 m x 85.60 m on the east side; 7.60 m x 50 m on the west side.
The floors have a capacity of 5 t/m2 for static load and 4.6 t/m2 for concentrated static load (on a 16 x 14 cm plate).
Quotas for trucks and vans: trucks = 120 cm; vans = 80 cm.
The property is equipped with an external fire ring and provision for a sprinkler system, including all accessories (tank and pumps). There is also a smoke detection system.
A photovoltaic system with a power of 390 kW has been positioned on the roof, which will allow the development of approximately 400,000 kWh per year.
The newly designed warehouse also boasts a predisposition for an anti-intrusion and video surveillance system (wells / ducts, etc.) and a predisposition for the installation of a shelter (both on the east and west side).
The certification process according to the Leed Silver standard has been started for this property.