New construction Two-family villas and Apartments in Zibido San Giacomo

Zibido San GiacomoVia Previato
  • € 296,000 - € 435,000
  • 3 - 5
  • from120
  • 8
Description

This description has been translated automatically by Google Translate and may not be accurate

GREEN VILLAGE ZIBIDO SAN GIACOMO is located in a STRATEGIC POSITION, a few minutes from the important HUMANITAS HOSPITAL CENTER, near the motorway entrance (Binasco/Assago toll booth) and only 6 km from Trezzano Sul Naviglio.

THE BUILDING - We offer new and exclusive building built with innovative materials and finished in every detail;
The building consists of 6 residential units, two solutions on the ground floor with private garden and 4 apartments on the upper floors with lift (2 on the first floor and 2 on the second floor).
All apartments have a minimum size of m2. 115, 3 and 4 room solutions and in any case customizable, with covered terraces of approx. 22 well usable.
All apartments have a technical room on the living floor, which can also be used as a laundry room as well as a garage on the ground floor.
Construction details in the attached specifications and floor plans of the available solutions.
DELIVERY AUTUMN/WINTER 2025
APARTMENTS FROM € 296.000, 00.

THE VILLAS - We offer new and exclusive semi-detached villas with innovative materials and finished in every detail;
The villas are spread over two living levels, on the ground floor we find the living area with large living room and open or eat-in kitchen of m2. 42, hallway leading to the bathroom with window, technical room and adjacent garage and uncovered parking space; while on the first floor, 3 bedrooms, second bathroom and hobby room with balcony.
Free garden on 3 sides and large covered porches!
Construction details in the attached specifications and floor plans of the available solutions.

DELIVERY AUTUMN/WINTER 2025
VILLAS TO BE €407,000.00.--5e119a9ed91a4e8d3addb43a9c5cd491!
Information
other features
Disabled access
Window frames in triple glass / PVC
Features
Reference and listing Date
GREEN VILLAGE ZIBIDO - 04/18/2024
contract
Sale - Download brochure
unit
8 residential
Construction start and expected delivery date
03/31/2024 - 10/31/2025
type
Project
total building floors
2 floors
Car parking
8 in garage/box
other features
Window frames in triple glass / PVC
Work progress

PROGETTO APPROVATO

Type and prices
Energy efficiency
heating
Independent, floor heating, powered by heat pump
Air conditioner
Independent, cold/hot
Renewable Energy Performance Index
≥ 3,51kWh/m² year
Energy performance of the building
wintery summery
Energy Efficiency
A3≥ 3,51 kWh/m² year, almost zero energy building
Additional options

Contact the advertiser