This description has been translated automatically by Google Translate and may not be accurate
The stand-alone asset will be built according to the specific needs of the future tenant (Built-to-Suit). The building permit (PDC) is expected to be obtained in Q4 2023, with a construction timeline of approximately 8 months. The Grade A listed building will be constructed to the highest quality standards to meet the needs of the future tenant. The development will rise in the municipality of Melzo (MI), in a strategic position for the access of the TEEM and the Bre.Bre.Mi.
Features
Reference
Melzo Logistics Development (MI)- Magazzino in locazione