New construction Terraced villas in Rome

RomeCastel di LevaVia Alfredo Grandidier
  • € 295,000
  • 4
  • from80
  • 1
Description

This description has been translated automatically by Google Translate and may not be accurate

Catel di Leva, Via Grandidier / Via Ruppel. In an elegant newly built complex of 14 villas on two floors above ground with large gardens and parking spaces. The villas consist on the ground floor of a living room, kitchenette, bedroom and bathroom with no window. First floor, not attic, with bedroom, single bedroom, bathroom with window and terrace. The villas have a floor area ranging from 83 square meters to 89 square meters. The exteriors have sizes ranging from 71 square meters to 125 square meters. Possibility of combining two to have a larger square footage. Pergola as per floor plans. Large glazed areas. The property includes an assigned parking space outside the complex. work started, delivery by May 2024. Dedicated appointments in Via Grandidier. The villas are self-heating, have air conditioning installed on the ground floor, through a ducted system and on the first floor set up. The autonomous heating and cooling systems will refer to the relative heat pumps located in the loggias, with a potential that guarantees the entire heat requirement, and the production of domestic hot water. These heat pumps will be complete with connections to the water supply network, to the electricity network, and to photovoltaic panels. As optionals you can request the underfloor heating system, alarm installation, irrigation and garden lighting, shutters for greenhouse shading and glass part on the first floor and home automation. Surety to guarantee the sums paid.
Possibility to customize the interiors and materials from the manufacturer's specifications. Possibility of taking over the Builder's loan.--658d14d416ad171485c1ec97619f0e28!
Information
other features
Bicycle parking
Features
Reference and listing Date
Villette Castel di Leva in Via Grandidier/Via Ruppel - 03/22/2024
contract
Sale - Download brochure
unit
14 residential
Construction start and expected delivery date
05/07/2022 - 05/30/2024
type
Project
total building floors
1 floor
other features
Bicycle parking
Work progress

lavori iniziati, consegna entro maggio 2024

Type and prices
Energy efficiency
heating
Independent, floor heating, gas powered
Air conditioner
Independent, cold/hot
Energy performance of the building
wintery summery
Energy Efficiency
A4≥ 3,51 kWh/m² year
Additional options

Contact the advertiser