New construction Apartments in Bari

BariMungivaccaVia Giannini
  • € 312,000
  • 3
  • from116
  • 1
Description

This description has been translated automatically by Google Translate and may not be accurate

Two-room, three-room and four-room apartments of various sizes in the new building Sant'Antonio Complex.
Bonus earthquake with discount on invoice. No agency fees. Delivery in July 2024.
Contact us to view the project .

Virtual render tours of the interiors are available. The apartments are certified triple class A and are made with the most innovative measures to ensure functional, efficient and lasting energy savings. The buildings are equipped with inter-floor sound insulation and on the entire housing unit; thermal insulation; heating and cooling system with heat pump and ultraslim fan coil terminals; solar thermal system for heating domestic hot water; thermal break windows; shutters with electric opening; TV SAT system and video intercom.

EXTERNAL: The complex consists of buildings with four floors above ground and two underground floors with garages, parking spaces and cellars. The units have a private patio or balcony terrace. The residential area is equipped with a security guard; green area; rainwater recovery and recycling system; photovoltaic system serving the common areas. Covered parking space included in the price.

LOCATION: 190 meters from the Showville multiplex. 250 meters from the new Famila hypermarket. 700 meters from the accesses to the ring road and the state road 100. Main services within 1 km.

STRONG POINTS: Surety to guarantee all deposits paid. Customization of the property. Strategic position. Green areas. Covered parking space included in the price.

The images published are for indicative purposes only and do not constitute a contractual obligation.--01922ce862745a414e706f1167ad4e93!
Information
other features
Disabled access
Bicycle parking
Shared garden
Window frames in double glass / PVC
Features
Reference and listing Date
Complesso_Sant_Antonio - 02/01/2024
contract
Sale - Download brochure
unit
170 residential
Construction start and expected delivery date
05/16/2022 - 10/31/2024
type
Project
total building floors
4 floors
Car parking
200 in garage/box
other features
Bicycle parking
Shared garden
Window frames in double glass / PVC
Type and prices
Energy efficiency
heating
Independent, with radiators, powered by heat pump
Air conditioner
Independent, cold/hot
Energy Efficiency
A3≥ 3,51 kWh/m² year
Virtual tour
Additional options

Contact the advertiser